Off-grid power for telecom sites, Saudi Arabia

Off-grid · Telecom · 50 kW solar + 900 kWh battery per site · 30+ sites supplied

The problem

More than 30 remote telecom base stations needed power every hour of the year, with no grid and no one on site. The design had to keep a 6 kW continuous load running through five days without sun.

The system

Illustration of a typical off-grid telecom site. Not a photo of the actual sites.
Illustration of a typical off-grid telecom site. Not a photo of the actual sites.
Component Specification
Continuous load 6 kW
Autonomy 5 days without solar
Solar PV 50 kW
Battery 900 kWh LFP
Enclosure 20 ft outdoor unit (ODU)
Delivery C&F Jeddah

What we did differently

Before the final design, we recommended installing a DC energy meter at each site to measure the real load for several weeks. Telecom loads are often well below the nameplate figure, and measuring first avoids paying for battery capacity the site never uses.