Brownout-proof power for factories in the Philippines
Keep your lines running through brownouts and red alerts, and pay less for power.
In 2026 the Luzon, Visayas and Mindanao grids have all gone on yellow and red alert, with rotational brownouts in several areas. Every brownout stops production, spoils materials and burns diesel. A solar + battery system keeps your critical loads running and cuts one of the highest power bills in Asia.
What a system does for your site
No stop during brownouts
Critical machines, cold rooms and IT switch to the battery in milliseconds. No restart, no spoiled batch.
Lower power bills
Solar supplies your daytime load. The battery covers evening hours.
Less diesel
The generator starts only for long outages, automatically.
Built for typhoons
Mounting structures are designed and calculated for local wind loads.
Typical systems for Philippine sites
| Site | Typical system | Main benefit |
|---|---|---|
| Workshop or small factory | PP-50: 50 kWp + 100 kWh | Brownout backup + lower bills |
| Food processing or cold storage | PP-100: 100 kWp + 215 kWh | No spoiled stock during brownouts |
| Large factory or economic-zone tenant | PP-250 to PP-500 | Critical lines protected, lower peak cost |
| Island or remote site | PP-20 to PP-100 off-grid + genset | 24-hour power where the grid is weak or absent |
Prices depend on your loads and site. Your free assessment includes a suggested retail price range.
See a brownout before it happens
Switch between scenarios and watch the energy flow: a brownout at 10:00, a night outage, a long outage after a cloudy day.
Built and serviced locally
Your system is installed by a TF PowerProof Certified Partner in the Philippines and signed off by our engineers at every stage. You buy the system from, and sign with, a certified local partner, who installs and services it. For large projects, a turnkey contract with TF PowerProof is also possible.
Frequently asked
How fast does the battery take over in a brownout?
In milliseconds for loads on the critical bus. Machines and computers keep running.
Can it work with my existing generator?
Yes. The energy management system starts the generator only when the battery runs low, and stops it when the grid returns.
Can I export surplus power to the grid?
For smaller systems, net metering may apply. We size most factory systems to use all solar power on site.