Power Assessment Report (SAMPLE)

Prepared for: Sample Plastics Ltd. (fictional), Gauteng, South Africa Prepared by: TF PowerProof engineering team Report no.: PA-SAMPLE-001 · Date: October 2026

This is a sample report for a fictional factory. Your own report is based on the data you send us. All figures are estimates for decision-making and are confirmed in the detailed proposal.

1. Summary

Today With the recommended system
Outage hours affecting production about 8 h per day 0 h for critical loads
Diesel use about 3,950 L per month about 800 L per month (around 80% less)
Diesel cost (at USD 1.20/L) about USD 4,740 per month about USD 960 per month
Critical load backup without the generator none about 4.3 h at full critical load, longer with solar during the day

Recommended system

120 kWp solar + 215 kWh lithium (LFP) battery + 100 kW hybrid inverter/PCS + energy management system (EMS), working with the existing 150 kVA diesel generator.

Suggested retail price range

included in your own report (not shown in this public sample). See section 6.

2. Your site and loads

Item Value (from customer data)
Industry Plastic injection moulding
Working hours Two shifts; main production 07:00–19:00
Average load, daytime (07:00–19:00) 70 kW
Average load, night (19:00–07:00) 15 kW
Daily energy use about 1,020 kWh
Peak load about 120 kW
Critical loads (must never stop) 45 kW: 2 moulding machines, chiller, air compressor, office and IT
Grid Connected, frequent load shedding: about 8 h per day (about 5 h in the day, 3 h at night)
Existing generator 150 kVA diesel, runs during every outage
Available area 900 m² metal roof
Existing batteries None

Today: the generator supplies about 395 kWh per day during outages. At low and medium load it produces about 3.0 kWh per litre, so it burns about 132 L per day.

4. Outage simulation

Scenario A: grid outage at 10:00, lasting 5 hours

The battery takes over immediately. Solar supplies most of the load during the day, and the battery covers the rest. The generator does not start. Battery state of charge falls from 95% to about 60%.

Scenario B: night outage at 22:00, lasting 3 hours

The battery supplies the 15 kW night load (about 45 kWh). The generator does not start. Battery state of charge falls from about 80% to about 60%.

Scenario C: long outage after a cloudy day

The battery reaches its lower limit after about 4 hours at full critical load. The EMS starts the generator, which supplies the loads and recharges the battery, then shuts down when the grid returns.

Result

in the simulated typical week, critical loads were never interrupted, and the generator ran about 11 hours instead of about 56 hours.

5. Lifetime cost (illustrative)

Item 10 years 20 years
Diesel saved (at USD 1.20/L, no price increase) about USD 450,000 about USD 900,000
Grid electricity saved (about 300 kWh per day at USD 0.13/kWh) about USD 140,000 about USD 270,000
Battery replacement none expected (LFP rated 6,000+ cycles) one replacement around year 12–15: about USD 25,000
Solar output after degradation about 95% of year 1 about 90% of year 1
Maintenance about USD 1,500 per year about USD 1,500 per year
End-of-life handling battery and panel disposal through a compliant channel: about USD 3,000 —

Compared with a lead-acid battery bank of similar usable capacity: lead-acid would typically need replacing every 3–5 years at this cycling rate, about 2–3 replacements in 10 years.

6. Reference equipment list and suggested retail price range

Item Option A Option B
PV modules Brand option A (model in your report) Brand option B (model in your report)
Hybrid inverter / PCS Brand option A (model in your report) Brand option B (model in your report)
LFP battery cabinet Brand option A (model in your report) Brand option B (model in your report)
EMS and monitoring Included Included
Mounting, cables, protection Included Included

Suggested retail price range

included in your own report, in USD, CIF to your port. Not shown in this public sample. Installation by a TF PowerProof Certified Partner in your area, quoted by the partner.

How we choose equipment

certification (IEC / UN38.3), warranty terms, after-sales support in your country, and fit with your loads.

7. Assumptions and next steps

Assumptions

  • Load and outage figures as provided by the customer; not yet verified on site
  • Solar yield 4.6 kWh/kWp/day, based on Global Solar Atlas data for Johannesburg
  • Generator efficiency about 3.0 kWh/L at low and medium load
  • Diesel price USD 1.20/L, no price increase
  • Grid tariff USD 0.13/kWh average, no increase

Next steps

  1. Confirm loads and outage pattern (a short WhatsApp call, plus photos of the main switchboard)
  2. We prepare the detailed proposal, full simulation report and single-line diagram (included with your order)
  3. Final quote with trade terms

Your contact: your TF PowerProof project engineer, WhatsApp +86 151 9255 3850, sales@tfpowerproof.com