The project
A museum in Xiong'an New Area wanted a microgrid that could run on its own or alongside the grid, with little or no staff attention.
| Component | Specification |
|---|---|
| Solar PV | 21 kWp |
| Inverters | 4 × 5 kW |
| Battery | 50 kWh LFP |
| Control | Energy management system (EMS) coordinating solar, battery and grid |
| Output | About 38,600 kWh per year, used on site, surplus stored |
What it shows
- Island or grid-tied. The microgrid runs on its own or alongside the grid, and switches automatically.
- EMS control. One system balances solar, battery and grid, with real-time monitoring and alarms.
- Hands-on commissioning. Our engineers surveyed the site and commissioned the system in person.




The same EMS approach runs in our larger hybrid systems for factories.